This would allow increased capacity, and at the same time reduce the amount of traffic in the city streets.
In 1984 the facility was refurbished, including lowering the floor to allow maximum capacity to increase from 16,664 to 18,865 for basketball.
This would allow four-abreast seating, and much higher capacity than with the existing stock.
An upgrade to the terminal building to allow larger capacity was completed in 2007.
The stand allows for standing and seating capacity at the stadium.
This would allow increased capacity without extending the runway.
This station configuration allows a higher throughput and therefore capacity.
Later, a separate pair of tracks were installed at the government's cost to allow greater capacity and higher speeds.
The field was lowered in 1936, allowing capacity to reach 24,000.
In 1828 the tower was added, with the stairs inside allowing more seating capacity within.